Puerto Vallarta, Jalisco, Sept. 7, 2026 – Municipal crews cleaned, pruned and repainted the Cerro de la Cruz lookout Sunday, covering accumulated graffiti at the El Centro landmark.
The city’s Historic Center office said the Sept. 6 work included general cleaning, vegetation trimming, maintenance and paint. It also asked the public to protect the installations and report vandalism.
We reviewed the official notice and a second dated account of the work. Neither announced a closure or change to public access during the operation.
Access from El Centro
The lookout sits about 500 meters uphill from the Malecón. The route described by Puerto Vallarta’s tourism office connects with Abasolo Street near Emilio Carranza Street before continuing toward the summit.
Another official route description says the climb passes through cobblestone lanes and narrow pedestrian stairways. The tourism office estimates the walk from the Malecón takes 15 to 30 minutes, depending on physical condition.
For residents who use the climb for exercise and visitors arriving from downtown, the announced work was limited to vegetation and painted surfaces. The city did not list repairs to paths, stairs, railings, lighting or signs.
Maintenance has continued throughout 2026
Sunday’s operation followed several city-led maintenance rounds at Cerro de la Cruz earlier this year.
During a late-March cleanup campaign, municipal employees and volunteers repainted surfaces, removed waste and worked on the lookout’s landscaping. Crews also restored metalwork and trimmed dry vegetation around the site.
“It is an emblematic place that receives many visitors from very early until night,” Javier Navarro, head of City and Historic Center Management, said during that campaign. He said people use the lookout for exercise and views of Banderas Bay.
By May, officials described the lookout as renewed after cleaning, painting, and maintenance under the “Mi Mirador Renace” program. The September operation came about four months later and singled out accumulated graffiti.
A larger rehabilitation has been proposed
The routine work comes against a broader city plan for Cerro de la Cruz. An October 2025 proposal presented to the Historic Center Citizen Council placed the estimated rehabilitation cost at 18.5 million pesos.
That outline called for renewed paths, stairs and rest areas. It also proposed erosion repairs, lighting, signs, rainwater collection and a long-term maintenance program.
Safety at the lookout also came under scrutiny in November 2025 after a 13-year-old student died following a bicycle fall on the Abasolo route. The City Council approved a request for preventive signs, while municipal officials said traffic restrictions would be studied.
The Sept. 6 announcement described pruning, cleaning, and painting rather than the construction or safety work contained in the broader rehabilitation outline.

