Los Cabos officials say the Santa Anita housing project is moving forward after a plan review with Infonavit, aiming for roughly 20,000 new homes near San José del Cabo. City leaders are drawing a hard line: no massive build-out without reliable water, electricity, drainage, schools, and clinics. The scale is huge, tied to a federal push for affordable housing, and it’s colliding with the peninsula’s resource limits. What gets decided now will shape how fast, where, and even whether thousands of families can actually move in.
Santa Anita housing project
Los Cabos leaders say a long-discussed expansion at Santa Anita is back on the front burner. After a new plan review with Infonavit, the mayor signaled support for adding roughly twenty thousand homes on the mesa outside San José del Cabo—so long as water, power, and core services come first. Local coverage on Wednesday repeated that bottom line, highlighting the city’s stance that public infrastructure must be guaranteed before homes rise.
Behind the scenes, the idea is not new. In recent weeks, the municipality publicly evaluated a master plan known as “Mesa Seca,” described as the most extensive Infonavit housing development in the country and mapped just beyond the Santa Anita plateau. City notes say the concept envisions tens of thousands of units in connected neighborhoods, plus land reserved for urban infrastructure. That puts the Santa Anita buildout inside a broader federal program aimed at accelerating affordable housing while formalizing land and services.
What “moving forward” actually means
For now, the city is in the review-and-coordination phase, not the bulldozer phase. The municipality says any development must sequence water and power capacity, drainage, roads, and social infrastructure—schools and clinics—before large-scale occupancy. That insistence reflects current stress on Los Cabos utilities and the wider reality that Baja California Sur’s growth has outpaced supply. It also mirrors Mexico’s national housing strategy, which pushes construction but demands service guarantees to avoid repeating past sprawl with thin infrastructure.
At the same time, figures in public statements vary by venue. City communications about the Mesa Seca plan reference “more than 23,000” homes in the zone behind Santa Anita, while the mayor’s recent remarks center on “about 20,000” specifically in Santa Anita. Both numbers point to unprecedented scale for Los Cabos, but they also signal that scoping is still underway. Local outlets have echoed the 20,000-home figure and emphasized the precondition that utilities and public services be locked in before signing off on construction.
Who decides what comes next
Three players will shape the pace: Infonavit, which finances and coordinates housing delivery; the municipality, which controls permits and service sequencing; and state and federal agencies that manage water, energy, and land regularization. The city recently framed Santa Anita planning inside larger efforts to tidy tenure and set aside donation areas for community uses—steps that open doors to mortgages and accelerate formal neighborhoods. If service guarantees hold, Los Cabos could add housing at a scale that dents local shortages; if not, the project will stall until supply catches up. The same tension—rapid growth colliding with limited water and power—has slowed other federal housing pushes this year.





