Puerto Vallarta News

Puerto Vallarta News

Work progresses on Cuale River bridge damaged by Hurrican Nora

The placement of beams on what will be the two lanes of the bridge that crosses the Cuale River in the downtown area of ​​Puerto Vallarta has begun, according to informed the Secretariat of Infrastructure and Public Works of Jalisco (SIOP).

Since last weekend, prestressed concrete structures 32 meters long, 1.35 meters deep, and weighing approximately 34 tons each began to arrive, which entered through the main avenue of the city, coming from the capital of the State after a road trip of more than 18 hours.

The first 4 of the 13 beams . . .

Read Full Story

Related Posts

san miguel

US congressional delegation to visit San Miguel de Allende

Bipartisan American lawmakers led by Michael McCaul will stop in San Miguel de Allende amid...
Playa del Carmen Carnival 2026 free concerts announced

Playa del Carmen Carnival 2026 free concerts announced

Carnaval 2026 in Playa del Carmen runs Feb 11–17. Free Plaza 28 de Julio shows...
Top Chef Los Cabos returns Feb. 20 in San José del Cabo

Top Chef Los Cabos returns Feb. 20 in San José del Cabo

Top Chef Los Cabos 2026 is Feb. 20 at Jazmín’s in San José del Cabo,...
Mexican Navy in Puerto Vallarta removes one ton of waste from Boca de Tomates

Mexican Navy in Puerto Vallarta removes one ton of waste from Boca de Tomates

Mexico’s Navy says it removed 1,000 kg of plastic, glass, aluminum and fishing gear from...